An award-winning project showcasing our commitment to quality
WHAT WE DID
We provided bulk excavation for an 850-space 8 hectare park and ride facility. Our approach to material handling on site used an innovative grid technique which transformed delivery and is now used on all our earthworks projects.
WHAT WE DELIVERED
Site clearance
Cut and fill operations
Soil modification
Materials processing and disposal
Construction of an attenuation pond
KeyAchievements
Driving efficiency: We built 3D models from the designer’s 2D information. Incorporated into our machines’ telematics, these models promoted safer, faster, more efficient working.
Innovative and quality focused: This project involved significant materials planning and management. To manage this and provide assurance, we spearheaded a new grid system. Aligned with our modelling, testing and tracking protocols this meant we knew where every section of soil came from, where it went to and if/how it was modified.
Continuous assurance: We regularly inspected and verified all materials and workmanship, supplying reports and certificates to the client.
PROJECT STATISTICS
60,000m³
excavation of topsoil/subsoils
9,000m³
soil stabilisation
30,000m³
embankment fill
30,000t
aggregate import
29,000m³
material disposal
Award winning
WE WON BALFOUR BEATTY’S UK CONSTRUCTION SERVICES SUPPLY CHAIN HEALTH AND SAFETY AWARD
FOR OUR PLANNING DURING THE ECI PHASE, FOR HOW WE EMBEDDED THE CLIENT’S PROCEDURES INTO OUR OWN ON-SITE, AND THE RESULTING SEAMLESS REPORTING SYSTEM.