RESIDENTIAL

With the increasing number of residential units being delivered and in the planning pipeline across the South West, MJ church has significantly grown its expertise and residential teams. We are able to deliver site enabling and infrastructure projects enabling developer’s specialist house builders to get on with the task of building new home without the worry of dealing with major civil engineering challenges: deep drainage systems and SUDs, temporary haul roads and access, services provision. We are also able to undertake 278 packages from improving access to construction of new junctions, roads and roundabout as well as constructing estate roads. We also understand the impact our works have on the environment and local neighbours and adopt the appropriate communications strategies approach expected by our clients and local communities.

We are able to deliver and manage:
• Principal and subcontractor contracts
• Design & Build projects
• Site preparation & Infrastructure
• Drainage and SUDs
• Services
• Groundworks
• 278 Works and Electrical Street Works

arrow-down

RECENT PROJECTS

soil-top2
From the moment MJ Church won the tender, the company showed true professionalism and a fantastic attitude in delivering a highly political scheme, with minimal fuss. Overall, I would happily recommend MJ Church as a contractor, as well as any of the staff who directly worked on the scheme.

I just wished to offer my thanks and congratulations to MJC for an excellent job in creating the new car park, we are all delighted with the finished product. I’m happy to report that there always spare spaces so it seems to have done its job, de-stressing the patient journey.

I would like to thank MJC for all their efforts over the last 7 months. I’ve been extremely impressed by the professional attitude of all your employees and the excellent quality of their work.

We have exceeded expectations and have set a very high standard of delivering challenging Rail Civil Engineering Projects. We thank all those involved in delivering the works safely, to programme and to a very high quality. Although the 16-day period was for those on point very tiring and challenging, I can honestly say that I have never enjoyed working so much with such a Great team!

soil2

Follow us:

footer-img