Recent Projects

Recent Projects

 

DSCF0049 (1280x960) (2) (2)

New Retail Park, Bath Road Chippenham

For Mansell

Value £400,000 – Construction of new retail units on the former Focus site Chippenham.  MJC are involved in storm and foul drainage including a large attenuation tank, groundworks, RC foundations and base slabs as well as hard landscaping.

 

M4VRS Photo (2)

M4 J16-17 Vehicle Restraint System (VRS) Works

For Atkins Skanska Joint Venture – Highways Agency Area 2

Value £350,000 – Carry out works to create foundation for new concrete safety barrier to central reserve of M4 including drainage repairs.

2296063_fa322a1a

M4 J16-17 Geotechnical Works

For Atkins Skanska Joint Venture – Highways Agency Area 2

Value £400,000 – Carry out bulk earthworks and remediation to M4 including drainage repairs.

12052011628 (2)

Bath Western Riverside Development: (1) Enabling works and Section 278 works (2) Infrastructure works Phase One

For Galliford Try Infrastructure Limited

(1) Value £300,000 – Highways and infrastructure, bulk earthworks and remediation, reconfiguring of the existing access and construction of the new access road, deep foul and storm damage.

(2) Value £2million – Highways and infrastructure, bulk earthworks, deep excavation temporary works design and installation, large diameter storm drainage and attenuation systems, public utilities and service installation.

Reading

Reading Train Station – Platform Infilling and Drainage

For Costain/Hochtief Joint Venture

Value £400,000 – Infilling of new platforms 11-15, storm and foul drainage including installation of the Aco Qmax and installation of Carson Ducting.

IMGP1420

Highworth Cycle Track – NEC3 Engineering and Construction Short Contract

For Swindon Borough Council (Main Contractor)

Value £400,000 – Construction of 700m cycletrack / footpath linking Highworth to Swindon.  Works included site clearance, groundwork, surfacing, traffic signals, street lighting and road markings.

To see this project in more detail click here

photo

Emergency Railway Embankment Works – Various locations

For Bam-Nuttall, Murphy’s and AMCO

Value £500,000 – M J Church have been working closely with Network Rail and the contractors above to carry out emergency stabilisation works to railway embankments across the south west which have slipped due to recent weather conditions.  M J Church were able react quickly mobilising on the same day as the slip occurred and working 24hrs until the railway embankment has be made safe to enable full line speed to be restored and normal service to resume.

2013-02-22-1290

Bath Transportation Package – Lot 2 Extension to Lansdown Park & Ride Car Park

For Balfour Beatty Civil Engineering Ltd

Value £500,000 – Bulk earthworks including playing field remodelling, car park formation construction including provision of granular make up, storm drainage and attenuation and ducted service installations.

2013-02-28-1344

Newbury Racecourse; Section 278 Works

For Birse Civils Ltd

Value £350,000 – Highway construction and profiling works, deep storm drainage and attenuation system, multiple utility and service installation.